The Space Launch System rocket and Orion spacecraft for the Artemis I flight test are rolling to launch pad 39B at NASA’s Kennedy Space Center in Florida ahead of launch. Credit: NASA The journey began at around 11:17 p.m. EDT (8:17 p.m. PDT) on November 3 as the crawler-transporter began the approximately 4-mile journey from the VAB to the launch pad. Once outside the VAB high-bay doors, the Moon rocket made a planned pause allowing the team to reposition the crew access arm on the mobile launcher before continuing to the launch pad. Artemis I launch is currently targeted for November 14 at the opening of a 69-minute launch window starting at 12:07 a.m. EST. Artemis I will be the first integrated test of NASA’s SLS rocket and Orion spacecraft. The primary goal of Artemis I is to thoroughly test the integrated systems before crewed missions by launching Orion atop the SLS rocket, operating the spacecraft in a deep space environment, testing Orion’s heat shield, and recovering the crew module after reentry, descent, and splashdown.